The safety of our students and staff is of the highest priority! Here are the measures in place at our campus.
- Summer 2022:
- Installation of three fences from Howard Fencing, Inc.:
- 7' tall wrought iron gate at the end of the hallway to the playground
- 7' tall wrought iron fence between the gym and classrooms
- 6' tall chain link fence from the classroom building to the existing chain link fence
- November 2021
- Installation of a 1080p Ubiquiti Camera System
- Main entry wrought iron gate
- Parking lot wrought iron gates